Vol 23 No 1 (2017)

Published: 2017-01-19

Articles


Conceptual cost estimations using neuro-fuzzy and multi-factor evaluation methods for building projects

Wei-Chih WANG, Tymur BILOZEROV, Ren-Jye DZENG, Fan-Yi HSIAO, Kun-Chi WANG
Abstract 13 | PDF Downloads 6 | DOI https://doi.org/10.3846/13923730.2014.948908

Page 1-14

The behavior characteristics of a reservoir levee subjected to increasing water levels

Chung-Won LEE, Yong-Seong KIM, Sung-Yong PARK, Dong-Gyun KIM, Gunn HEO
Abstract 14 | PDF Downloads 4 | DOI https://doi.org/10.3846/13923730.2014.948912

Page 15-27

Page 28-36

A fast and accurate method to predict reliability of project completion time

Chun-Qing LI, Guomin ZHANG, Mahdi HOSSEINIAN
Abstract 11 | PDF Downloads 6 | DOI https://doi.org/10.3846/13923730.2014.953570

Page 37-46

Page 47-58

Page 59-66

Page 67-75

Impact of linear thermal bridges on thermal transmittance of renovated apartment buildings

Simo ILOMETS, Kalle KUUSK, Leena PAAP, Endrik ARUMÄGI, Targo KALAMEES
Abstract 10 | PDF Downloads 9 | DOI https://doi.org/10.3846/13923730.2014.976259

Page 96-104

Page 125-136

Stochastic carbon emission estimation method for construction operation

Chang-Yong YI, Han-Seong GWAK, Dong-Eun LEE
Abstract 9 | PDF Downloads 5 | DOI https://doi.org/10.3846/13923730.2014.992466

Page 137-149