Bian, Z., Q. Xu, N. Li, and Z. Jin. “Scheduling for Yard Cranes Based on Two-Stage Hybrid Dynamic Programming”. Transport, vol. 33, no. 2, Jan. 2018, pp. 408–417, doi:10.3846/16484142.2016.1255993.