Statybos įmonės valdymo koordinavimo sistema/The system of management coordination at building enterprises

    Romualdas Ginevičius Affiliation

Abstract

Co-ordination of a building enterprise activities alonside with division of labour represents the second essential organizational principle. Co-ordination is performed by four methods: by personal directives, self-managing, programmes and plans. The first two of them may be applied to the feed-back co-ordination and the preliminary one, others only to the preliminary co-ordination.


A system of a building enterprise activities co-ordination can be measured by a system of indices. Such system includes partial measures expressing the scale of combining the application of co-ordinating mechanisms and a generalized index which unites in a certain way the partial indices.


First Published Online: 26 Jul 2012

Keyword : -

How to Cite
Ginevičius, R. (1996). Statybos įmonės valdymo koordinavimo sistema/The system of management coordination at building enterprises. Journal of Civil Engineering and Management, 2(8), 101-103. https://doi.org/10.3846/13921525.1996.10590177
Published in Issue
Dec 31, 1996
Abstract Views
23
PDF Downloads
21