Lee, M. ., & Lee, U.-K. . (2020). A framework for evaluating an integrated BIM ROI based on preventing rework in the construction phase. Journal of Civil Engineering and Management, 26(5), 410-420. https://doi.org/10.3846/jcem.2020.12185