Lee, Myungdo, and Ung-Kyun Lee. 2020. “A Framework for Evaluating an Integrated BIM ROI Based on Preventing Rework in the Construction Phase”. Journal of Civil Engineering and Management 26 (5):410-20. https://doi.org/10.3846/jcem.2020.12185.