Koo, C., Hong, T. and Kim, S. (2015) “An integrated multi-objective optimization model for solving the construction time-cost trade-off problem”, Journal of Civil Engineering and Management, 21(3), pp. 323-333. doi: 10.3846/13923730.2013.802733.