Hu, W., Zhong, D., Wu, B. and Li, Z. (2019) “Construction phase oriented dynamic simulation: taking RCC dam placement process as an example”, Journal of Civil Engineering and Management, 25(7), pp. 654-672. doi: 10.3846/jcem.2019.7948.