Rhim, H.-C., K.-M. Kim, and S.-W. Kim. “Development of an Optimum Pre-Founded Column System for Top-down Construction”. Journal of Civil Engineering and Management, vol. 18, no. 5, Sept. 2012, pp. 735-43, doi:10.3846/13923730.2012.723397.