Vol 25 No 7 (2019): In Progress

Published: 2019-07-02

Articles

Page 654-672

An extended TODIM method for project manager’s competency evaluation

Jielin Yin, Jian Guo, Tianmeng Ji, Jingru Cai, Lei Xiao, Zhao Dong
Abstract 24 | PDF Downloads 8 | DOI https://doi.org/10.3846/jcem.2019.10521

Page 673-686

A model for evaluating the risk effects on construction project activities

Usama Hamed Issa, Salah Attia Mosaad, Mohamed Salah Hassan
Abstract 14 | PDF Downloads 7 | DOI https://doi.org/10.3846/jcem.2019.10531

Page 687-699

Page 700-714

Forecasting of sports fields construction costs aided by ensembles of neural networks

Michał Juszczyk, Krzysztof Zima, Wojciech Lelek
Abstract 8 | PDF Downloads 5 | DOI https://doi.org/10.3846/jcem.2019.10534

Page 715-729