Vol 26 No 7 (2020)

Published: 2020-07-03

Articles

Developing a comprehensive risk assessment model based on fuzzy Bayesian belief network (FBBN)

Li Guan, Qiang Liu, Alireza Abbasi, Michael J. Ryan
Abstract 922 | PDF Downloads 751 | DOI https://doi.org/10.3846/jcem.2020.12322

Page 614-634

Page 635-650

Factors causing rework and their impact on projects’ performance in Egypt

Assim Muwafaq Al-Janabi, Mohamed Shawky Abdel-Monem, Karim Mohamed El-Dash
Abstract 508 | PDF Downloads 218 | DOI https://doi.org/10.3846/jcem.2020.12916

Page 666-689

Invited Review

Life cycle sustainability assessment for multi-criteria decision making in bridge design: a review

Ignacio Javier Navarro, Vicent Penadés-Plà, David Martínez-Muñoz, Rasmus Rempling, Víctor Yepes
Abstract 246 | PDF Downloads 89 | DOI https://doi.org/10.3846/jcem.2020.13599

Page 690-704