Błaszczyk, Tomasz, and Maciej Nowak. 2009. “The time‐cost trade‐off Analysis in Construction Project Using Computer Simulation and Interactive Procedure”. Technological and Economic Development of Economy 15 (4):523-39. https://doi.org/10.3846/1392-8619.2009.15.523-539.