Błaszczyk, T. and Nowak, M. (2009) “The time‐cost trade‐off analysis in construction project using computer simulation and interactive procedure”, Technological and Economic Development of Economy, 15(4), pp. 523-539. doi: 10.3846/1392-8619.2009.15.523-539.